Sydney Gateway Project Design and Construction
- Date
2020 - ongoing - Location
Mascot, New South Wales - Client
John Holland Pty Ltd & Seymour Whyte Constructions Pty Ltd - Project Value
$1.5 billion - Team Members
Andrew Parker, Raymond Sim, Angus Rawle, Andrew Story
Description
The Sydney Gateway road project includes the following Stages:
- Stage One that will provide a new road connection linking the Sydney motorway network at St Peters Interchange with Sydney Airport’s International Terminal and Qantas Drive
- Stage Three is an arterial road connection and flyover to Sydney Airport’s Domestic Terminals, including improvements to existing roads to reduce congestion and improve connectivity to Sydney Airport Domestic Terminals and towards Port Botany
Resonate’s Involvement
Resonate is currently working with the John Holland Seymour Whyte Joint Venture to deliver the Operational Noise and Vibration Review. A report required by the planning approval conditions to review and confirm noise mitigation measures on the basis of the detailed design.
Resonate is also providing assistance with the specification of at-property noise treatments for the project.
Project Outcome
Our involvement is still ongoing and we look forward to providing updates on this very exciting and significant infrastructure project for Sydney.